Mixed-UseChicago, IL210,000 sq ft
Replacement Quote
$2.1M
vs.
Restoration Cost
$680,000
68% savings
Timeline12 days, phased
Warranty30-Year Gaco
Roof TypeMulti-Building Phased Restoration
Buildings Completed3 under one contract
The Challenge

Why a $X replacement
wasn't the answer.

A three-building mixed-use complex in Chicago totaling 210,000 sq ft faced combined replacement estimates of $2.1M. The buildings shared retail ground floors with occupied residential above — no building could be taken offline. The ownership group needed a single-vendor, single-contract solution under $750,000, and the project had to complete before the first winter freeze narrowed the installation window.

01

$2.1M combined replacement estimate across three buildings — board required single-contract solution under $750K or project would be deferred two fiscal years

02

Mixed occupancy throughout (retail ground floor + residential upper) — no single building could be taken out of service for conventional tear-off

03

Chicago's narrow pre-freeze window required all three buildings to complete before October 15

The Process

Assessment to warranty
in 12 days, phased.

01

Portfolio Scope & Sequencing

Single assessment covered all three buildings. Phased sequencing planned to allow simultaneous crew deployment on non-adjacent roofs.

02

Building 1 & 2: Parallel Installation

Two crews deployed simultaneously on the two smaller buildings. Retail and residential tenants experienced no disruption.

03

Building 3: Main Structure

Largest building (110,000 sq ft) completed in 6 days by full crew after Buildings 1 and 2 were under warranty.

04

Single-Contract Close

All three buildings closed under one contract, one warranty registration, one invoice. Final cost: $680,000.

Financial Summary

The complete picture
for your CFO.

$2.1M
Replacement Quote
$680,000
Restoration Cost
$1.4M
Net Savings vs. Replacement
$238,000
Est. Section 179 Deduction
35% of project cost, Year 1
$442,000
Est. Year 1 Net Cost
After Section 179 tax benefit
30-Year Gaco
Manufacturer Warranty

Section 179 estimate based on 35% effective tax rate. Consult your CPA for project-specific tax treatment under IRS Section 179 qualified improvement property rules.

The board approved one condition: all three buildings, one contract, under $750,000. Individual replacement bids were $2.1M. Certified structured a phased restoration across 12 days that hit $680,000 — $70,000 under budget — and finished before the freeze window closed. Tenants in all three buildings experienced zero disruption.
William D.Asset Manager, Lakefront Property Holdings
Project Outcomes — Chicago, IL
210,000
Square Feet Restored
$1.4M
Saved vs. Replacement
12 days, phased
Project Duration
30-Year Gaco
Manufacturer Warranty

Three buildings, one contract, 12 days. Final project cost of $680,000 came in $70,000 under the board-approved budget. All installations completed before the October freeze window. No tenant notification required across any of the three buildings.

Free Commercial Roof Assessment

What could your building save?

Every project starts with a free infrared moisture survey and written report. No obligation. If restoration isn’t the right solution for your roof, we’ll tell you.

No commitment requiredFree written reportResponse within 1 business day