Six industries.
One consistent outcome.
Every case study below includes the original replacement quote, the restoration cost, verified savings, and a direct quote from the facilities professional who made the call. No stock photos. No fabricated numbers.
“We had 14 documented leak points and a $1.1M replacement quote on the table. The board was not going to approve that num…”
“Managing a five-building retail portfolio means roof problems multiply. We had three of five buildings with active leak…”
“We had CNC equipment sitting under active leaks and a 5-6 week production shutdown on the table if we replaced the roof…”
“Two contractors had been on our roof before Certified. Both missed the wet insulation entirely. Certified's infrared sur…”
“The board approved one condition: all three buildings, one contract, under $750,000. Individual replacement bids were $2…”
“We had a state sustainability mandate, a $1.04M replacement quote requiring bond issuance, and an 18-month procurement t…”
Your building could be
the next case study.
Every project above started with a free infrared moisture survey. No commitment. No pressure. If restoration isn’t right for your roof, we’ll tell you.
Request My Free Assessment