ServicesTPO RestorationEPDM CoatingMetal RestorationRestore vs. ReplaceWorkLocationsBlogROI CalculatorAboutContactFree Assessment
Our Work

Six industries.
One consistent outcome.

Every case study below includes the original replacement quote, the restoration cost, verified savings, and a direct quote from the facilities professional who made the call. No stock photos. No fabricated numbers.

$4.2M
Total Client Savings
620,000
Square Feet Documented
6
Industries Represented
DistributionDallas, TX
$1.1M
$396,000
64% savings — $704,000 kept
120,000 sq ft4 days20-Year Momentive

We had 14 documented leak points and a $1.1M replacement quote on the table. The board was not going to approve that num…”

James P.Director of Operations
Read case study →
RetailAtlanta, GA
$365,000
$127,000
65% savings — $238,000 kept
48,000 sq ft8 days25-Year GAF

Managing a five-building retail portfolio means roof problems multiply. We had three of five buildings with active leak…”

Sandra K.VP of Real Estate
Read case study →
IndustrialColumbus, OH
$935,000
$318,000
66% savings — $617,000 kept
85,000 sq ft6 days30-Year Gaco

We had CNC equipment sitting under active leaks and a 5-6 week production shutdown on the table if we replaced the roof…”

Robert M.Plant Operations Manager
Read case study →
HealthcareNashville, TN
$744,000
$236,000
68% savings — $508,000 kept
62,000 sq ft5 days30-Year Gaco

Two contractors had been on our roof before Certified. Both missed the wet insulation entirely. Certified's infrared sur…”

Thomas K.Director of Facilities
Read case study →
Mixed-UseChicago, IL
$2.1M
$680,000
68% savings — $1.4M kept
210,000 sq ft12 days, phased30-Year Gaco

The board approved one condition: all three buildings, one contract, under $750,000. Individual replacement bids were $2…”

William D.Asset Manager
Read case study →
GovernmentPhoenix, AZ
$1.0M
$332,000
68% savings — $713,000 kept
95,000 sq ft7 days30-Year Gaco + ENERGY STAR Certified

We had a state sustainability mandate, a $1.04M replacement quote requiring bond issuance, and an 18-month procurement t…”

Patricia L.Director of Public Works
Read case study →
Free Commercial Roof Assessment

Your building could be
the next case study.

Every project above started with a free infrared moisture survey. No commitment. No pressure. If restoration isn’t right for your roof, we’ll tell you.

Request My Free Assessment