One roof.
Six leases.
Every leak is a claim.
Multi-tenant industrial roofing at scale — restore across all bays in a single mobilization without disrupting a single tenant business.
One mobilization
across the whole park.
Roof Restoration Systems
Spray-applied, seamless silicone membrane over existing substrate. Compatible with TPO, EPDM, modified bitumen, metal, and built-up roofs. Momentive Perma-Sil and Gaco S20 authorized applicators.
Infrared Inspections
Thermal imaging reveals moisture intrusion before it causes structural damage.
Energy Efficiency Upgrades
ENERGY STAR certified reflective coatings reduce cooling loads across your portfolio.
Ponding Water Solutions
Silicone's water resistance eliminates ponding damage — no re-sloping required.
Preventive Maintenance
Annual inspection programs with documented reporting for warranty compliance.
Emergency Leak Response
48-hour mobilization for active leaks. Nationwide dispatch from regional hubs.
Single-vendor coverage
across your portfolio.
Multi-tenant industrial roofing at scale — restore across all bays in a single mobilization without disrupting a single tenant business.
What a leak costs
under a triple-net lease.
Multi-tenant industrial roofing at scale — restore across all bays in a single mobilization without disrupting a single tenant business.
Multiple Tenants, One Roof Event
Coordinating a traditional tear-off across a building with 8–12 tenants is a logistics impossibility. Silicone restoration eliminates the coordination problem — the system installs without disrupting any tenant below.
Metal and Modified Bitumen at End of Life
Industrial and flex buildings disproportionately use metal and modified bitumen roofing — both of which fail at seams, fasteners, and lap joints. Our restoration addresses all three failure modes simultaneously.
Emergency Leaks Over Tenant Operations
A roof failure over an active tenant space creates immediate liability — property damage, business interruption, and lease exposure. Emergency response within 48 hours protects both the building and the landlord-tenant relationship.
"The window for restoration over replacement is finite. Most buildings have 3–7 years before the substrate condition forecloses the option."
Request AssessmentStop trading tenant goodwill for deferred maintenance.
Silicone roof restoration for multi-tenant industrial and flex buildings — no tenant downtime, 50–75% less than replacement, manufacturer warranties to 30 years.
Everything
Connected.
Every service, every metro, every data-backed reference — linked.