ServicesTPO RestorationEPDM RestorationMetal Roof CoatingRestore vs. ReplaceIndustriesManufacturersWorkLocationsBlogROI CalculatorAboutContactFree Assessment
Multi-Tenant Industrial

One roof.
Six leases.
Every leak is a claim.

Multi-tenant industrial roofing at scale — restore across all bays in a single mobilization without disrupting a single tenant business.

0
Tenant business disruptions during restoration
50–75%
Cost savings vs. full roof replacement
5–8 days
Typical restore time on 200,000 sq ft
Scope

One mobilization
across the whole park.

Coverage

Single-vendor coverage
across your portfolio.

Multi-tenant industrial roofing at scale — restore across all bays in a single mobilization without disrupting a single tenant business.

NortheastSoutheastMidwestSouthwestWest CoastMountain
Northeast Hub
NY · PA · MA · CT · NJ
14 crews
Southeast Hub
FL · GA · NC · TN · AL
11 crews
Midwest Hub
OH · IL · MI · IN · MO
16 crews
Southwest Hub
TX · AZ · NM · OK · AR
13 crews
West Coast Hub
CA · OR · WA · NV · CO
10 crews
Landlord Exposure

What a leak costs
under a triple-net lease.

Multi-tenant industrial roofing at scale — restore across all bays in a single mobilization without disrupting a single tenant business.

01

Multiple Tenants, One Roof Event

Coordinating a traditional tear-off across a building with 8–12 tenants is a logistics impossibility. Silicone restoration eliminates the coordination problem — the system installs without disrupting any tenant below.

02

Metal and Modified Bitumen at End of Life

Industrial and flex buildings disproportionately use metal and modified bitumen roofing — both of which fail at seams, fasteners, and lap joints. Our restoration addresses all three failure modes simultaneously.

03

Emergency Leaks Over Tenant Operations

A roof failure over an active tenant space creates immediate liability — property damage, business interruption, and lease exposure. Emergency response within 48 hours protects both the building and the landlord-tenant relationship.

"The window for restoration over replacement is finite. Most buildings have 3–7 years before the substrate condition forecloses the option."

Request Assessment
⚡ Limited Q2 Assessment Slots Available|Book Before April 30 to Guarantee Pre-Summer Scheduling|Free · No Commitment · 48-Hour Results

Stop trading tenant goodwill for deferred maintenance.

Silicone roof restoration for multi-tenant industrial and flex buildings — no tenant downtime, 50–75% less than replacement, manufacturer warranties to 30 years.

Confirmed no-disruption installation for all tenant types simultaneously
Multi-building portfolio scheduling and pricing
Manufacturer warranty for each building — unified documentation
Experience with the specific building profile (metal, modified bitumen, TPO)