Technical Specifications
Built for TPO. Engineered to last.
Every specification below is matched to the unique chemistry and failure modes of TPO substrates. No generic coating — a targeted solution for the most common commercial roofing membrane.
TPO Restoration FAQ
Common questions about TPO roof restoration
Yes. Silicone bonds directly to clean, sound TPO without a primer in most cases. Our crew prepares the surface, reinforces seams, and applies the coating in a single mobilization.
Seam failures are one of the most common restoration scenarios. We reinforce failed seams with fabric-embedded silicone as part of surface prep, then apply the full overcoat. The restored seam is stronger than the original.
Candidacy depends on deck structure integrity and wet insulation saturation levels. If wet insulation is below 25% of total area, most TPO roofs qualify. Our free infrared survey determines this definitively.
No. Installation is completed from the roof surface with no interior access required. The coating is rain-safe in 15 minutes. Most commercial TPO restorations complete in 1–3 days with zero downtime.
The silicone system can be recoated at warranty end for another full warranty term — no tear-off required. Your TPO roof never becomes a capital replacement line item.
Related Services